Bharti Airtel Ltd. Airtel Center
Location: Gurugram, Haryana, India
Client Name: CBRE
Year: 2024
Rating Awarded: LEED Zero Water Certification
Brief about the project:
- A sewage water treatment plant (STP) with a design capacity of 200 KLD was installed on site. The treated water from the STP is reused for flushing, HVAC Cooling tower makeup, irrigation, and hardscape cleaning purposes at the facility.
- More than 80% of the landscape area is covered with native vegetation to reduce the water consumption for irrigation at the site.
- Rainwater harvesting pits with a capacity of 366 cubic meters to capture roof and non-roof rainwater